Marx street - pivot property management

Client:

Edmund Elliot, LLC

620 SW 5th Ave., Suite 300

Portland, OR 97204

Summary:

     

Completed:

2018

 

maxsent security office- Lloyd Center

Client:

CAPREF Lloyd II, LLC

8343 Douglas Ave. Suite 200

Dallas, TX 75225

Summary:

      

Completed:

2018

 

OHSU administration offices- Lloyd Center

Client:

Glimcher/Lloyd Venture, LLC

2201 NE Lloyd Center

Portland, OR 97232

 

Summary:

Providing General Contractor services for new 10,000 SF of Class A

Administration Office expansion in tenant occupied space. $47,068.00.      

Completed:

2017

 

 

Lloyd Center exterior repairs

Client:

CAPREF Lloyd II, LLC

8343 Douglas Ave. Suite 200

Dallas, TX 75225

 

Summary:

Exterior repairs to parking structure & exterior envelope components for seismic & structural renovations.    

Completed:

2017

 

 

Lloyd Center structural column upgrades

Client:

CAPREF Lloyd II, LLC

8343 Douglas Ave. Suite 200

Dallas, TX 75225

 

Summary:

Retrofit interior structural columns to meet current seismic & earthquake

standards.    

Completed:

2016

 

best buy- Lloyd Center mall

Client:

CAPREF Lloyd II, LLC

8343 Douglas Ave. Suite 200

Dallas, TX 75225

 

Summary:

Commercial tenant improvements of Best Buy Outlet Store.    

Completed:

2015

 

Papa murphy's take n' bake pizza

Client:

Papa Doug's Inc.

Doug Storey

Portland, OR

 

Summary:

Beaverton Mall, OR: Providing general contractor services to complete new tenant improvement from vanilla shell including under-ground utilities & finishes.    

Completed:

2015

Summary:

Newberg, OR: Construction of new stand alone building to house interior Papa Murphy's Take N' Bake Pizza.    

Completed:

2012

 

Phoenix Inn suites

Client:

JMI Reality

Phoenix Inns, LLC

 

Summary:

Projects in: Bend, Tigard, Beaverton, Eugene, Lake Oswego.

Pre-construction management and construction services to repair failing EIFS

application, mold/ mildew remediation and structural upgrades on an upscale retail

center. Scope includes assistance with insurance claim and litigation preparation.

Completed:

2009

 

Hillsboro Promenade- Exterior Repair

Client:

Hillsboro Promenade, LLC

3352 Holiday court, Suite 224

La Jolla, CA 97037-1808

Summary:

Providing construction management and general contractor services, overseeing

exterior façade evaluation and repair to large retail shopping center. $400,500.00+

Completed:

2004

 

Pacific Place Center- Repair

Client:

Columbia Commercial Properties

8460 SW Hunziker Road, Suite D

Tigard, OR 97223-8244

Summary:

Pre-construction management and construction services to repair failing EIFS

application, mold/ mildew remediation and structural upgrades on an upscale retail

center. Scope includes assistance with insurance claim and litigation preparation.

$547,300.00+

Completed:

2003

 

Albertson's Store- Exterior Repair

 

Client:

Albertson's Inc.

17001 NE San Rafael Street

Portland, OR 97230-6085

Summary:

Providing construction management services and carpentry to repair failing exterior

façade to an anchor store in retail shopping center. $46,826.00+

Completed:

 

Forest Grove Promenade

 

Client:

Sterling Development

3352 Holiday Court, Suite 224

La Jolla, CA 92037-1808

Summary:

Providing construction management/ GC services overseeing development and construction of new retail facility. $100,000.00+

Completed:

 

Papa Murphy's Take N' Bake pizza- camas relocation

 

Client:

James Lovelace

5512 NE 109th Court, Suite F

Vancouver, WA 98662-6175

Summary:

Providing general contractor services to complete new tenant improvement from

vanilla shell including under-ground utilities & finishes. $77,617.77

Completed: 2003

 

La Belle Vie - Lloyd Center

 

Client:

La Belle Vie I, Inc.

12000 SE 82nd Avenue, #1004-L103

Portland, OR 97266-7729

Summary:

Providing design/ build services for 1,200 SF day spa including architectural,

plumbing, mechanical and electrical plans as well as high-end finishes. $192,687.76

Completed: 2002

 
Apollo.jpg

Apollo college - Lloyd Center

Client:

Glimcher Development Corp.

20 S. Third Street

Columbus, OH 43215-4244

Summary:

Provided General Contractor services for fast-track buildout of 12,246 SF technical training facility including value engineering, classroom improvements and medical

equipment installation. $430,795.36

Completed: 2002

 

transformer - Lloyd Center

Client:

Glimcher/Lloyd Venture, LLC

2201 NE Lloyd Center

Portland, OR 97232

Summary:

Provided Emergency construction services to remove and replace five-ton electrical unit at Oregon’s largest indoor mall. $43,325.94

Completed: 2002

 

imperial beach promenade

Client:

Promised Land Development, LLC

3352 Holiday Court, Suite 224

La Jolla, CA 92037-1808

Summary:

Provided Construction Management services overseeing the completion of public/private retail redevelopment project. $39,950.00

Completed: 2002

 

papa murphy’s take n’ bake pizza - Andresen fire restoration

Client:

Papa Murphy’s International

8000 NE Parkway Drive, Suite 350

Vancouver, WA 98662

Summary:

Provided emergency salvage services to prepare a fire & water damaged outlet for reconstruction. Served as liaison with the primary insurance carrier claims adjuster as well

as center’s general contractor to complete a fast-track full restoration of the space to mitigate downtime and expedite reopening. $195,968.88

Completed: 2002

 

papa murphy’s take n’ bake pizza - Pacific highway relocation

PMPH1.jpg

Client:

Papa Murphy’s International

8000 NE Parkway Drive, Suite 350

Vancouver, WA 98662

PMPH2.jpg

Summary:

Provided General Contractor services to complete the conversion of an existing

free-standing building to meet the client’s specific criteria, including site

renovations, finishes, mechanical and electrical systems. $80,542.00

Completed: 2002

 
TG1.jpg

toni & guy salon - Lloyd Center

Client:

Comtex Construction Services

3402 Wiley Post Road

Carrollton, TX 75006-5116

TG2.jpg

Summary:

Provided General Contractor services for new, upscale hair salon including value

engineering, high-end finishes, new mechanical and electrical systems.

$225,238.00

Completed: 2002

 

space b112 - Lloyd Center

Client:

Glimcher/Lloyd Venture, LLC

2201 NE Lloyd Center

Portland, OR 97232

Summary:

Provided design, engineering and construction management services to divide space and bring to vanilla shell condition. $26,580.00

Completed: 2002

 

900 “F” street apartments

Client:

Protea Holdings, LLC

3352 Holiday Court, Suite 224

La Jolla, CA 92037-1808

Summary:

Provided construction management services reviewing construction methodology used in HUD housing development project. $29,419.00

Completed: 2001

 
HT2.jpg
HT1.jpg

hot topic - Lloyd center

Client:

Hot Topic, Inc.

18305 E San Jose Avenue

City of Industry, CA 91748-1237

Summary:

Provided construction services to complete the fast-track tenant improvement of

new retail space for national chain. $125,605.00

Completed: 2001

 

space f112 - Lloyd center

Client:

Glimcher/Lloyd Venture, LLC

2201 NE Lloyd Center

Portland, OR 97232

Summary:

Provided construction services for new corridor and to complete vanilla shell requirements. $51,050.00

Completed: 2001

 
ON2.jpg
ON1.jpg

old navy - Beaverton mall

Client:

Fisher Development, Inc.

1485 Bayshore Blvd. #152

San Francisco, CA 94124

Summary:

Performed all metal framing, drywall, storefront, EIFS and painting trades required

for tenant improvement on new 22,372 SF retail facility. $289,843.07

Completed: 2001

 
MN.jpg

Merle Norman Cosmetics - Lloyd Center

Client:

Ms. Dorothy Anderson

1307 NE Lloyd Center

Portland, OR 97232

Summary:

Provided design, engineering and construction management services for the relocation for one of Lloyd Center’s original tenants. $130,133.00

Completed: 2001

 

beard frame shop - Lloyd Center

Client:

Beard Frame Shop

PO Box 84003

Seattle, WA 98124

Summary:

Provided construction and management services to complete the fast-track tenant

improvement of this client’s new retail space including wall finishes, ADA restroom

upgrade and electrical. $55,333.50

Completed: 2001

 

north pacific renovations

Client:

North Pacific Group, Inc.

815 NE Davis

Portland, OR 97208

Summary:

Provided design, engineering and construction management services to oversee the renovation of an owner-occupied, four story high-rise building including structural,

space, mechanical, elevator and control systems. $78,075.00

Completed: 2001

 

space b215 - Lloyd Center

Client:

Glimcher/Lloyd Venture, LLC

2201 NE Lloyd Center

Portland, OR 97232

Summary:

Provided design, engineering and construction management services to revert tenant-improved space to vanilla shell condition. $38,115.17

Completed: 2001

 

gap 2000/gap body - Lloyd Center

Client:

Fisher Development, Inc.

1485 Bayshore Blvd. #152

San Francisco, CA 94124

Summary:

Performed all trades except fire protection, mechanical and electrical required on a

14,000 SF retail conversion. $422,391.93

Completed: 2000

 

old navy - Lancaster mall

Client:

Fisher Development, Inc.

1485 Bayshore Blvd. #152

San Francisco, CA 94124

Summary:

Performed all carpentry, metal, graphic design and electrical trades required for tenant improvement on new 28,000 SF retail facility. $117,799.00

Completed: 2000

 

gap & gap kids - Gresham station

Client:

Fisher Development, Inc.

1485 Bayshore Blvd. #152

San Francisco, CA 94124

Summary:

Supplied and installed nearly 10,000 SF of premium wood flooring as well as all

resilient floor coverings in new retail outlet location. Provided extra finish work as

directed by client. $113,727.95

Completed: 2000

 

space h220 - Lloyd Center

Client:

Glimcher/Lloyd Venture, LLC

2201 NE Lloyd Center

Portland, OR 97232

Summary:

Provided engineering and construction management services for landlord portion of tenant improvement project. $29,528.70

Completed: 2000